Products

US 3Pin Plug to C13 tail power cord

Specifications for this item

Item Code: KY-C073

Certificate:ETL

Wire model:SVT

Model: 18AWG (3×0.824mm2)

Length:2000mm Conductor:Standard copper conductor

Rated Voltage:125V

Rated Current:10A

Jacket:PVC outer cover

Color:black


Product Detail

Product Tags

Product Details

Technical requirements

1. All materials must comply with the latest ROHS&REACH standards and environmental protection requirements

2. The mechanical and electrical properties of plugs and wires must comply with the ETL standard

3. The writing on the power cord must be clear, and the appearance of the product must be kept clean

Electrical performance test

1. There should be no short circuit, short circuit and polarity reversal in the continuity test

2. The pole-to-pole withstand voltage test is 2000V 50Hz/1 second, and there should be no breakdown

3. The pole-to-pole withstand voltage test is 2000V 50Hz/1 second, and there should be no breakdown

4. The insulated core wire should not be damaged by stripping the sheath

More introduction about this item

2

Product application range

FAQs

May I buy samples from you? 

Yes! You are welcome to place sample order to test our superior quality and services.

What is your Warranty?

All the products will have 12 months Warranty

What payment method do you accept?

T/T(Bank transfer), Western Union, Paypal, etc.

Terminal work instructions

Purpose: Clarify the key points and precautions of the terminal operation

Definition: Uniform operating specifications for terminal pressure

Scope of application: Suitable for all terminal operations of our company

Duty: All terminal operators need to work according to this standard

Operating standard steps

1.The operator needs to check the production order and the operation flow card before starting the machine, make sure whether the indicated terminal model is consistent with the terminal installed on the machin

2.Use the mold adjusting button to manually work to see if the terminal and the die are matched,  whether the upper and lower die are properly riveted

3.Test the terminal tension for the first terminal sample

4. After confirmed all the above things, fill in the first item confirmation form and notify the quality controller to check the first sample 

5. After the first sample confirmed OK, start normal operation

Precautions

1.If you need to reach the middle of the blade during the terminal process, you must turn off the power of the machine firstly or use a steel cone

2. After emptying the terminal crimped, check whether there is any terminal stuck in the upper and lower die, to avoid overlapping double-playing of the terminals, leads to blade broken

3. Self-inspection should be done during the operation to avoid and defective  products for batch production

4. If customer have special requirements, according to customer's requirments


  • Previous:
  • Next:

  • Write your message here and send it to us