Products

Short Lead Time for 110v Power Cord - korea 2 pin plug C7 Power cord – Komikaya

Specifications for this item


Product Detail

Product Tags

Related Video

Feedback (2)

"Control the quality by the details, show the power by quality". Our enterprise has strived to establish a remarkably efficient and stable team team and explored an effective excellent control system for 3 Wire Harness , Ac Cable C5 Us , Water Pfoof Cable Assembly , How about to start your good organization with our corporation? We are all set, properly trained and fulfilled with pride. Let’s start our new business enterprise with new wave.
Short Lead Time for 110v Power Cord - korea 2 pin plug C7 Power cord – Komikaya Detail:

Product Details

Technical requirements

1. All materials must comply with the latest ROHS&REACH standards and environmental protection requirements

2. The mechanical and electrical properties of plugs and wires must comply with the ENEC standard

3. The writing on the power cord must be clear, and the appearance of the product must be kept clean


korea 2 pin plug C7 Power cord (2)


korea 2 pin plug C7 Power cord (3)

Electrical performance test

1. There should be no short circuit, short circuit and polarity reversal in the continuity test

2. The pole-to-pole withstand voltage test is 2000V 50Hz/1 second, and there should be no breakdown

3. The pole-to-pole withstand voltage test is 4000V 50Hz/1 second, and there should be no breakdown

4. The insulated core wire should not be damaged by stripping the sheath

Product application range

Power cord is use for below end Electronic equipments:

FAQs

What certification has your company obtained

We have obtained ISO9001 Quality Management System Certification, IATF16949 system certification, access to high-tech enterprise certificate, Hdmi cable with adapter, USB-IF certification, AC power cord cable obtained 3C, ETL, VDE, KC, SAA, PSE, and other multinational certification.

May I know the status of my order?

Yes .The order information and photos at different production stage of your order will be sent to you and the information will be updated in time

Wire and terminal tension standard table

Wire Gauge Fixing force above KG Number of core wires
32# 0.8   
30# 1.0  7/0.1
28# 1.5  7/0.127
26# 2.5  7/0.16
24# 4.0  11/0.16
22# 5.0  17/0.16
20# 9.0  21/0.178
18# 13.0  34/0.178
16# 18.0  26/0.25
14# 27.0  41/0.25
12# 35.0  65/0.25

Product detail pictures:

Short Lead Time for 110v Power Cord - korea 2 pin plug C7 Power cord – Komikaya detail pictures

Short Lead Time for 110v Power Cord - korea 2 pin plug C7 Power cord – Komikaya detail pictures

Short Lead Time for 110v Power Cord - korea 2 pin plug C7 Power cord – Komikaya detail pictures

Short Lead Time for 110v Power Cord - korea 2 pin plug C7 Power cord – Komikaya detail pictures

Short Lead Time for 110v Power Cord - korea 2 pin plug C7 Power cord – Komikaya detail pictures

Short Lead Time for 110v Power Cord - korea 2 pin plug C7 Power cord – Komikaya detail pictures

Short Lead Time for 110v Power Cord - korea 2 pin plug C7 Power cord – Komikaya detail pictures


Related Product Guide:

Our mission will be to grow to be an innovative supplier of high-tech digital and communication devices by giving worth added design and style, world-class production, and service capabilities for Short Lead Time for 110v Power Cord - korea 2 pin plug C7 Power cord – Komikaya , The product will supply to all over the world, such as: Jordan, Los Angeles, America, Our solutions have national accreditation requirements for qualified, good quality products, affordable value, was welcomed by individuals all over the world. Our products will continue to improve inside the order and appear forward to cooperation with you, Definitely should any of those goods be of curiosity to you, be sure to letus know. We'll be satisfied to supply you a quotation up on receipt of the detailed needs.
  • This manufacturers not only respected our choice and requirements, but also gave us a lot of good suggestions, ultimately, we successfully completed the procurement tasks.
    5 Stars By Jo from Dubai - 2018.07.27 12:26
    Adhering to the business principle of mutual benefits, we have a happy and successful transaction, we think we will be the best business partner.
    5 Stars By Eileen from Berlin - 2017.06.16 18:23
    Write your message here and send it to us