Renewable Design for Washer Power Cord - US 3Pin Plug to C13 tail power cord – Komikaya
Renewable Design for Washer Power Cord - US 3Pin Plug to C13 tail power cord – Komikaya Detail:
Product Details
Technical requirements
1. All materials must comply with the latest ROHS&REACH standards and environmental protection requirements
2. The mechanical and electrical properties of plugs and wires must comply with the ETL standard
3. The writing on the power cord must be clear, and the appearance of the product must be kept clean
Electrical performance test
1. There should be no short circuit, short circuit and polarity reversal in the continuity test
2. The pole-to-pole withstand voltage test is 2000V 50Hz/1 second, and there should be no breakdown
3. The pole-to-pole withstand voltage test is 2000V 50Hz/1 second, and there should be no breakdown
4. The insulated core wire should not be damaged by stripping the sheath
More introduction about this item
Product application range
FAQs
May I buy samples from you?
Yes! You are welcome to place sample order to test our superior quality and services.
What is your Warranty?
All the products will have 12 months Warranty
What payment method do you accept?
T/T(Bank transfer), Western Union, Paypal, etc.
Terminal work instructions
Purpose: Clarify the key points and precautions of the terminal operation
Definition: Uniform operating specifications for terminal pressure
Scope of application: Suitable for all terminal operations of our company
Duty: All terminal operators need to work according to this standard
Operating standard steps
1.The operator needs to check the production order and the operation flow card before starting the machine, make sure whether the indicated terminal model is consistent with the terminal installed on the machin
2.Use the mold adjusting button to manually work to see if the terminal and the die are matched, whether the upper and lower die are properly riveted
3.Test the terminal tension for the first terminal sample
4. After confirmed all the above things, fill in the first item confirmation form and notify the quality controller to check the first sample
5. After the first sample confirmed OK, start normal operation
Precautions
1.If you need to reach the middle of the blade during the terminal process, you must turn off the power of the machine firstly or use a steel cone
2. After emptying the terminal crimped, check whether there is any terminal stuck in the upper and lower die, to avoid overlapping double-playing of the terminals, leads to blade broken
3. Self-inspection should be done during the operation to avoid and defective products for batch production
4. If customer have special requirements, according to customer’s requirments
Product detail pictures:
Related Product Guide:
We rely upon strategic thinking, constant modernisation in all segments, technological advances and of course upon our employees that directly participate inside our success for Renewable Design for Washer Power Cord - US 3Pin Plug to C13 tail power cord – Komikaya , The product will supply to all over the world, such as: Nairobi, Russia, Bangkok, By integrating manufacturing with foreign trade sectors, we can provide total customer solutions by guaranteeing the delivery of right products to the right place at the right time, which is supported by our abundant experiences, powerful production capability, consistent quality, diversified product portfolios and the control of the industry trend as well as our mature before and after sales services. We'd like to share our ideas with you and welcome your comments and questions.
By Abigail from Georgia - 2018.12.22 12:52
This is a very professional and honest Chinese supplier, from now on we fell in love with the Chinese manufacturing.
By Cara from Madras - 2018.02.08 16:45