Hot-selling Uk Plug Ac Power Cord - US 3Pin Plug to C13 tail power cord – Komikaya
Hot-selling Uk Plug Ac Power Cord - US 3Pin Plug to C13 tail power cord – Komikaya Detail:
Product Details
Technical requirements
1. All materials must comply with the latest ROHS&REACH standards and environmental protection requirements
2. The mechanical and electrical properties of plugs and wires must comply with the ETL standard
3. The writing on the power cord must be clear, and the appearance of the product must be kept clean
Electrical performance test
1. There should be no short circuit, short circuit and polarity reversal in the continuity test
2. The pole-to-pole withstand voltage test is 2000V 50Hz/1 second, and there should be no breakdown
3. The pole-to-pole withstand voltage test is 2000V 50Hz/1 second, and there should be no breakdown
4. The insulated core wire should not be damaged by stripping the sheath
More introduction about this item
Product application range
FAQs
May I buy samples from you?
Yes! You are welcome to place sample order to test our superior quality and services.
What is your Warranty?
All the products will have 12 months Warranty
What payment method do you accept?
T/T(Bank transfer), Western Union, Paypal, etc.
Terminal work instructions
Purpose: Clarify the key points and precautions of the terminal operation
Definition: Uniform operating specifications for terminal pressure
Scope of application: Suitable for all terminal operations of our company
Duty: All terminal operators need to work according to this standard
Operating standard steps
1.The operator needs to check the production order and the operation flow card before starting the machine, make sure whether the indicated terminal model is consistent with the terminal installed on the machin
2.Use the mold adjusting button to manually work to see if the terminal and the die are matched, whether the upper and lower die are properly riveted
3.Test the terminal tension for the first terminal sample
4. After confirmed all the above things, fill in the first item confirmation form and notify the quality controller to check the first sample
5. After the first sample confirmed OK, start normal operation
Precautions
1.If you need to reach the middle of the blade during the terminal process, you must turn off the power of the machine firstly or use a steel cone
2. After emptying the terminal crimped, check whether there is any terminal stuck in the upper and lower die, to avoid overlapping double-playing of the terminals, leads to blade broken
3. Self-inspection should be done during the operation to avoid and defective products for batch production
4. If customer have special requirements, according to customer’s requirments
Product detail pictures:
Related Product Guide:
"Sincerity, Innovation, Rigorousness, and Efficiency" would be the persistent conception of our enterprise with the long-term to build with each other with consumers for mutual reciprocity and mutual advantage for Hot-selling Uk Plug Ac Power Cord - US 3Pin Plug to C13 tail power cord – Komikaya , The product will supply to all over the world, such as: Rwanda, Houston, Los Angeles, With the development and enlargement of mass clients abroad, now we have set up cooperative relationships with many major brands. We have our own factory and also have many reliable and well-cooperated factories in the field. Adhering to the "quality first, customer first, We are provideing high-quality, low-cost products and first-class service to customers. We sincerely hope to establish business relationship with customers from all over the world on the basis of quality, mutually benefit. We welcome OEM projects and designs.
By Alice from Turkey - 2018.05.13 17:00
Problems can be quickly and effectively resolved, it is worth to be trust and working together.
By Darlene from Belize - 2017.12.19 11:10