Factory Outlets 2 Pin Power Cord - AU 3Pin Plug to C13 tail power cord – Komikaya
Factory Outlets 2 Pin Power Cord - AU 3Pin Plug to C13 tail power cord – Komikaya Detail:
Product Details
Technical requirements
1. All materials must comply with the latest ROHS&REACH standards and environmental protection requirements
2. The mechanical and electrical properties of plugs and wires must comply with the ENEC standard
3. The writing on the power cord must be clear, and the appearance of the product must be kept clean
Electrical performance test
1. There should be no short circuit, short circuit and polarity reversal in the continuity test
2. The pole-to-pole withstand voltage test is 2000V 50Hz/1 second, and there should be no breakdown
3. The pole-to-pole withstand voltage test is 4000V 50Hz/1 second, and there should be no breakdown
4. The insulated core wire should not be damaged by stripping the sheath
Product application range
Power cord is use for below end Electronic equipments:
FAQs
May I buy samples from you?
Yes! You are welcome to place sample order to test our superior quality and services.
What’s the leading time? (How long do you need to prepare my goods)?
The samples delivery (no more than 10pcs) will be arranged within 7days after payment, and the lead time for mass production will be 15-20 day after payment.
Scope of application
Scope of application
All operation of required tensile test
Work instuction:
1. Cut the same wire into piece with a length of 100MM and strip one end 10MM, and crimping terminal which to be tested
2. Put the terminal end of wire into the hook (fixture for clamping the terminal), and turn the screw to tighten the terminal to make it clamped and fixed (the direction of rotation of the locking screw is left loose and right tighten) ,Then put the other end of the wire into the clamp of the tension meter and lock and fix it
3. After the both ends of wire are clamped, first press the reset button to reset the meter, and then pull the rotating rod by hand to make the terminal completely pulled off. Then read the data on the meter (Metering) The pointer of the meter rotates a large scale to read 1KG, and rotates a small scale to read 0.2KG.
4. After the terminal tensile test qualified, then the batch compression operation can be carried out; if unqualified, it must be adjusted immediately and the compressed product should be isolated.)
Precautions:
1.During the tensile test, the rear leg of the terminal must not be riveted with insulation to prevent the rear leg from being stressed
2. The tension meter must be within the valid inspection period, and the meter must be reset to zero before the test
3. Tensile strength (tensile strength) shall be judged according to the drawing description if the customer has requirements, and shall be judged according to the conductor compression tensile force standard if the customer has no tensile requirements
Common defective Phenomenon:
1.Confirm whether the tension meter is within the valid inspection period and whether the meter is reset to zero
2.Whether the tensile force that the terminal can withstand conforms to the conductor compression tensile force standard)
Put defective products in the red plastic box
Product detail pictures:
Related Product Guide:
Bear "Customer first, High quality first" in mind, we perform closely with our consumers and provide them with efficient and experienced services for Factory Outlets 2 Pin Power Cord - AU 3Pin Plug to C13 tail power cord – Komikaya , The product will supply to all over the world, such as: Ecuador, Lisbon, Angola, We have a good reputation for stable quality products, well received by customers at home and abroad. Our company would be guided by the idea of "Standing in Domestic Markets, Walking into International Markets". We sincerely hope that we could do business with car manufacturers, auto part buyers and the majority of colleagues both at home and abroad. We expect sincere cooperation and common development!
By Rebecca from Oslo - 2017.11.11 11:41
This manufacturers not only respected our choice and requirements, but also gave us a lot of good suggestions, ultimately, we successfully completed the procurement tasks.
By Bernice from Swiss - 2017.12.31 14:53