Products

2022 Latest Design 240v Power Cord - US 2 pin plug to figure 8 power cord – Komikaya

Specifications for this item


Product Detail

Product Tags

Related Video

Feedback (2)

With our abundant experience and considerate products and services, we have been recognized to be a reputable supplier for a lot of global consumers for Ls Swap Obd2 Wiring , Australia Power Cable , Electrical Wiring Harness , Items won certifications with the regional and international primary authorities. For far more detailed information, please contact us!
2022 Latest Design 240v Power Cord - US 2 pin plug to figure 8 power cord – Komikaya Detail:

Product Details

Technical requirements

1. All materials must comply with the latest ROHS&REACH standards and environmental protection requirements

2. The mechanical and electrical properties of plugs and wires must comply with the ETL standard

3. The writing on the power cord must be clear, and the appearance of the product must be kept clean


AU 3Pin Plug to C13 tail power cord (3)


AU 3Pin Plug to C13 tail power cord (1)

Electrical performance test

1. There should be no short circuit, short circuit and polarity reversal in the continuity test

2. The pole-to-pole withstand voltage test is 2000V 50Hz/1 second, and there should be no breakdown

3. The pole-to-pole withstand voltage test is 4000V 50Hz/1 second, and there should be no breakdown

4. The insulated core wire should not be damaged by stripping the sheath

Product application range

Power cord is use for below end Electronic equipments:

FAQs

May I know the status of my order?

Yes .The order information and photos at different production stage of your order will be sent to you and the information will be updated in time.

Scope of application

Precautions:

1.During the tensile test, the rear leg of the terminal must not be riveted with insulation to prevent the rear leg from being stressed

2. The tension meter must be within the valid inspection period, and the meter must be reset to zero before the test

3. Tensile strength (tensile strength) shall be judged according to the drawing description if the customer has requirements, and shall be judged according to the conductor compression tensile force standard if the customer has no tensile requirements

Common defective Phenomenon:

1.Confirm whether the tension meter is within the valid inspection period and whether the meter is reset to zero

2.Whether the tensile force that the terminal can withstand conforms to the conductor compression tensile force standard)

Put defective products in the red plastic box


Product detail pictures:

2022 Latest Design 240v Power Cord - US 2 pin plug to figure 8 power cord – Komikaya detail pictures

2022 Latest Design 240v Power Cord - US 2 pin plug to figure 8 power cord – Komikaya detail pictures

2022 Latest Design 240v Power Cord - US 2 pin plug to figure 8 power cord – Komikaya detail pictures

2022 Latest Design 240v Power Cord - US 2 pin plug to figure 8 power cord – Komikaya detail pictures

2022 Latest Design 240v Power Cord - US 2 pin plug to figure 8 power cord – Komikaya detail pictures

2022 Latest Design 240v Power Cord - US 2 pin plug to figure 8 power cord – Komikaya detail pictures

2022 Latest Design 240v Power Cord - US 2 pin plug to figure 8 power cord – Komikaya detail pictures


Related Product Guide:

We keep on with our business spirit of "Quality, Performance, Innovation and Integrity". We goal to create much more worth for our customers with our rich resources, state-of-the-art machinery, experienced workers and exceptional providers for 2022 Latest Design 240v Power Cord - US 2 pin plug to figure 8 power cord – Komikaya , The product will supply to all over the world, such as: El Salvador, Iraq, Albania, We always insist on the principle of "Quality and service are the life of the product". Till now, our products have been exported to more than 20 countries under our strict quality control and high level service.
  • We are a small company that has just started, but we get the company leader's attention and gave us a lot of help. Hope we can make progress together!
    5 Stars By Nydia from Bandung - 2018.09.21 11:01
    Hope that the company could stick to the enterprise spirit of "Quality, Efficiency, Innovation and Integrity", it will be better and better in the future.
    5 Stars By Meroy from Czech - 2017.09.09 10:18
    Write your message here and send it to us